2402002183
|
04.10.2024 |
SWITCH,PUSH BUTTON AND INDICATION LAMPS |
23
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 93 |
25.11.2024 |
037b posted in SRM on 25-Nov-2024. |
|
|
|
|
2402002144
|
01.10.2024 |
TERMINAL BAR FOR SLIPRING INDUCTION MOTOR 355S8 |
1
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 81 |
28.10.2024 |
Technical Recommendation posted in SRM. To be approved by HOD. |
RFx # 2000004079 |
|
|
|
2402002049
|
21.09.2024 |
FIRING MODULE AND ARMATURE COIL ASSEMBLY FOR LHF OF CCM-I |
2
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 82 |
01.11.2024 |
Technical recommendation (037b) raised in SRM and approved by I/O. |
(RFx : 2000003989) To be approved by HOD. |
|
| 83 |
01.11.2024 |
Technical recommendation approved by HOD (in SRM). |
|
|
|
|
2402001943
|
11.09.2024 |
SLIPRING INDUCTION MOTOR 200L6 FOR CRANES (2 EA) |
1
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 119 |
27.02.2025 |
Amendment to PO-Deliver prepone to 28-Feb-2025. |
|
|
| 78 |
22.10.2024 |
037b posted in SRM and approved by HOD. Informed MM/MJ through mail. |
|
|
|
|
2402001887
|
07.09.2024 |
ELECTROHYDRAULIC THRUSTOR 185KG FOR EOT CRANES |
1
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 75 |
07.10.2024 |
Technical recommendation initiated and released by I/O in SRM. |
Pending for approval of the HOD. |
|
| 71 |
23.09.2024 |
Replied to email of ms Swagatika Behera (MJ) and suggested LTE thro' SRM. |
OTE thro' GEM was suggested as per the last PR. |
|
|
|
2402001674
|
16.08.2024 |
SQ. CAGE INDUCTION MOTOR FOR SLAG DUMPING CAR |
1
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 108 |
14.01.2025 |
GAD and MDS approved and sent to the vendor M/s Apex Trading Co |
|
|
|
|
2402001612
|
08.08.2024 |
SLIPRING INDUCTION MOTOR 355L10 FOR CRANE 235 OF CCM-I |
1
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 58 |
25.08.2024 |
Replied to the query of CGM(E) regarding Acceptable Makes. |
Query was given by CGM(E) to justify Acceptable Makes in Special Terms of the PR. Replied. |
|
| 55 |
12.08.2024 |
Release initiated after allocation of MSP budget for 2025-26. |
|
|
|
|
2402001563
|
05.08.2024 |
SQ CAGE INDUCTION MOTOR 280M4 FOR QUENCHER PUMP |
1
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 107 |
11.01.2025 |
Representation of New Age Centre examined in GEM and found OK. Replied to MJ. |
Representation of M/s New Age Trade Centre examined and found OK. |
|
|
|
2402001490
|
31.07.2024 |
INSULATOR FOR CRANE CURRENT COLLECTOR (400 EA) |
1
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 70 |
23.09.2024 |
037b posted by I/O in SRM on 23/09/2024 |
|
|
|
|
2402001396
|
23.07.2024 |
CARBON BRUSHES FOR MOTORS |
5
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 64 |
05.09.2024 |
Suggested MJ to exclude vendors through email, which are not registered in SRM. |
|
|
|
|
2402001000
|
21.06.2024 |
SPARES FOR CRANE 226 WEIGHING SYSTEM |
7
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 84 |
05.11.2024 |
Technical recommendation posted in GEM and eNote initiated. |
|
|
| 66 |
19.09.2024 |
Replied to Convenor (GM, MSS) regarding delivery after getting confirmation from M/s ABB. |
M/s ABB confirmed to supply within March-2025 if PO is placed within Dec-2024. |
|
| 51 |
07.08.2024 |
Estimate revised for Item-1 and 3 as per TA to CGM I/c (E&P) |
Estimate revised for Item-1 and 3 as per TA to CGM I/c (E&P)-LPP considered. |
|
|
|
2402000892
|
10.06.2024 |
SLIPRING INDUCTION MOTOR 180L6 |
1
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 59 |
30.08.2024 |
Drawings for 180L6 received from M/s Wheel Board thro' mail. Approved and replied. |
PO on M/s Wheel Board & Co. |
|
| 53 |
09.08.2024 |
037b posted in SRM and note initiated on 09/08/2024. |
|
|
|
|
2402000869
|
10.06.2024 |
SPARES FOR CASTER PLC (Schneider) |
8
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 63 |
05.09.2024 |
037b posted in SRM and eNote initiated. |
|
|
|
|
2402000372
|
27.04.2024 |
FAN, PUSH BUTTON AND MCB BOX |
6
|
2
|
|
Cable Tray and one fan rejected. RPN action taken. |
|
| Id |
Date |
Activity |
Remarks |
|
| 31 |
12.06.2024 |
037b posted in SRM on with HOD approval. |
|
|
|
|
2402000248
|
22.04.2024 |
WEB-BASED PLANNING MANAGEMENT SYSTEM |
1
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 37 |
24.06.2024 |
Technical recommendation posted in GEM and eNote initiated. |
|
|
| 27 |
30.05.2024 |
Discussed with Mr Biswajit Sahoo (GM, MM-P) and Mr Uday Anand (MJ) regarding the requirement. |
|
|
|
|
2402000057
|
08.04.2024 |
WEIGHING CONTROLLER FOR CONVERTERS |
1
|
1
|
|
|
|
| No Activity against this PR entered so far.
Click
here to add one.
|
|
|
2402000021
|
02.04.2024 |
HT MOTOR 750KW FOR GCP ID FAN 5 |
1
|
1
|
|
|
|
| Id |
Date |
Activity |
Remarks |
|
| 60 |
30.08.2024 |
Drawings received from M/s Wheel Board for approval. |
|
|
| 61 |
30.08.2024 |
eNote moved for amendment as requested by the vendor for Test Certificate clause. |
Material Test Certificate in Documents Required by Consignee to be replaced with Manufacturing Test Certificate. |
|
| 56 |
12.08.2024 |
MSP budget received for 2025-26 to release the PO. Intimated to Mr S. Ghosh |
|
|
| 49 |
30.07.2024 |
Mail received from Mr Omkar Mohanty regarding GEM error. |
Buyer (Santanu Ghosh) is unable to place order in GEM. |
|
| 44 |
18.07.2024 |
Technical recommendation posted in GEM and eNote moved. |
|
|
| 33 |
13.06.2024 |
Unblocked for release (> 45 days) by giving mail to G. Arora. Then released by CGM I/c (E&P). |
|
|
| 34 |
13.06.2024 |
Reply given to GM MM-P Mr B. Sahu in eNote to process the case. |
|
|
| 32 |
12.06.2024 |
PR dereleased (Chairman-CGM I/c E&P). Drawing clause to be added in Special Terms |
PR is not editable. ERP team to be contacted. |
|
| 26 |
30.05.2024 |
WO No. 9000099871 forwarded to Design deptt HOD |
as per MM-Purchase. |
|
|
|
2402000001
|
02.04.2024 |
POWER CONTACTORS (80A, 110A, 185A, 265A) |
4
|
1
|
|
|
|
| No Activity against this PR entered so far.
Click
here to add one.
|
|
|
2390000063
|
05.09.2023 |
AUTOMATION OF LD BY IO EXTENSION OF GCP PLC SYSTEM (AMR) |
1
|
1
|
|
|
|
| No Activity against this PR entered so far.
Click
here to add one.
|
|
|
2369000022
|
18.05.2023 |
CABLES FOR SMS-I |
2
|
0
|
|
|
|
| No Activity against this PR entered so far.
Click
here to add one.
|
|